Details for FULLENKAMP JOBEUN JOHNSON

Updated

FULLENKAMP JOBEUN JOHNSON & BELLER, LLP 11440 WEST CENTER ROAD OMAHA, NEBRASKA 68144 NOTICE TO CONTRACTORS SANITARY AND IMPROVEMENT DISTRICT NO. 296 OF SARPY COUNTY, NEBRASKA Sealed proposals will be received by the Clerk of said District at the office of E & A Consulting Group, 10909 Mill Valley Road, Omaha, Nebraska until 2:00 P.M. on the 3rd day of November, 2020, for furnishing all labor, tools, materials and equipment required to construct as PCSMP BASIN CONVERSION PHASE I for Sanitary and Improvement District No. 296, Sarpy County, Nebraska, as per the plans and specifications for said work, at the locations shown on the detailed drawings and in the specifications now on file with the Clerk of said District and available at the office of E & A Consulting Group, which proposals as are received will, at that time, be publicly opened, read aloud and tabulated. The work consists essentially of the following estimated quantities: APPROXIMATE QUANTITIES Item No. Description Quantity Unit 1. Remove 48" Riser Structure and Base 2 EA 2. Remove 24" RCP 169 LF 3. Construct 48" Type II Area Inlet, Modified 1 EA 4. Construct 72" Type II Area Inlet, Modified 1 EA 5. Construct 24" RCP 50 LF 6. Construct 36" RCP, D(0.01) = 1,350 121 LF 7. Install 24" FES 1 EA 8. Install 36" FES 1 EA 9. Excavate On-Site (Established Quantity) 510 CY 10. Embankment Borrow Haul In (Established Quantity) 807 LF 12. Install Inlet Protection 1 EA 13. Seed & Mat Disturbed Area Type A Mix 4,342 SY 14. Install North American Green VMAX C350 and Seed Type A Mix 256 SY 15. Construct Type A Rip-Rap 85 TN 16. Construct Type B Rip-Rap 42 TN 17. Construct Flexamat 1,008 SF 18. Construct 4" PCC Sidewalk 477 SF 19. Excavate, Dry and Re-Compact Silt or Haul Off Site 467 CY The amount of the engineer's estimate of the cost of said improvements (exclusive of engineering, fiscal, legal, interest, easement acquisition, and miscellaneous costs) is $100,000.00. All proposals must be submitted on bid forms furnished by E & A Consulting Group, and must be accompanied by an original bid bond or a certified check in the amount not less than $5,000.00 made payable to the Treasurer of Sanitary and Improvement District No. 296 as security that the bidder to whom the contract may be awarded will enter into a contract to build the improvements in accordance with this Notice to Contractor and will give a contract and maintenance bond in the amount of 100% of the total contract price, all as provided in the specifications. Bid bonds must be executed by a duly licensed corporate surety. Checks accompanying proposals not accepted shall be returned to the bidders. No bidder may withdraw his proposal for a period of sixty (60) days after date set for opening of bids. All proposals must be enclosed in an envelope, sealed and addressed to the "Clerk of Sanitary and Improvement District No. 296" and shall be marked "PROPOSAL FOR PCSMP BASIN CONVERSION PHASE I" with the bidder's name and address on said envelope. The Bid Security shall be in a separate sealed envelope attached to the Proposal envelope and shall be marked "BID SECURITY" with the project identified thereon. Proposals received after the above time shall be returned unopened to the bidder submitting the proposal. The work herein provided shall be done under written contract with the responsible bidder submitting the lowest acceptable bid in accordance with the requirements of the plans and specifications and as provided by law. Plans, specifications, and contract documents governing the above-referenced proposal as prepared by E & A Consulting Group, 10909 Mill Valley Road, Omaha, Nebraska, are hereby made a part of this Notice. The proposed contract shall be executed in compliance therewith. Copies of said plans and specifications may be obtained by interested bidders at the office of E & A Consulting Group upon payment of $35.00, none of which will be refunded. Sanitary and Improvement District No. 296 of Sarpy County, Nebraska, reserves the right to reject any or all bids received and to waive informalities and irregularities. SANITARY AND IMPROVEMENT DISTRICT 296 OF SARPY COUNTY, NEBRASKA By: Tim Young, Chairman Mark Boyer, Clerk 181993, 10/14,10/21, 10/28

Welcome to the discussion.

Please keep it clean, turn off CAPS LOCK and don't threaten anyone. Be truthful, nice and proactive. And share with us - we love to hear eyewitness accounts.